Equal thickness soil-cement underground continuous wall method "TRD method"
Seamless construction without discrepancies! Applications such as liquefaction countermeasures, ground reinforcement, and groundwater blockage are also possible.
The "TRD Method" achieves remarkable high precision and high capability construction, realizing cost savings through shortened construction periods. A chainsaw-type cutter inserted into the ground is connected to a base machine, which moves laterally to excavate trenches, inject solidifying agents, and mix and stir with in-situ soil, creating a continuous wall underground. Core materials such as H-beams can be inserted and applied as a soil retention and waterproofing wall during underground excavation, and it can also be used for liquefaction countermeasures, ground reinforcement, and groundwater blocking. 【Features】 ■ No risk of tipping, exceptional stability ■ Achieves remarkable high precision and high capability construction, realizing cost savings through shortened construction periods ■ Core material spacing can be set arbitrarily ■ Seamless and aligned construction ■ Smooth and beautiful constructed wall surfaces *For more details, please refer to the PDF materials or feel free to contact us.
- Company:三東工業社 栗東本社
- Price:Other